• 本课程为精品课,您可以登录eeworld继续观看:
  • PHASE ARRANGEMENT - 408.3(E) AND (F)​​​​​​​
  • 登录
课程介绍
相关标签: 电子系统
Switchboards are designed with busbars for fuses or circuit breakers that are used for protecting and supplying feeders and branch circuits. Panelboards are designed with a permanently installed main circuit breaker or single set of fuses for disconnecting the number of circuit breakers or fuseholders installed to protect and supply feeders or branch circuits.

SUPPORT AND ARRANGEMENT OF BUSBARS AND CONDUCTORS
408.3

Busbars shall be held firmly in place in the enclosure and shall be arranged in such a way to allow adequate space for conductors to be terminated. Busbars shall be sized with enough capacity to handle the normal currents in amps of the electrical system. In addition, they shall carry safely any type of short-circuit or ground-fault condition.

CONDUCTORS AND BUSBARS ON A SWITCHBOARD OR PANELBOARD
408.3(A)

Conductors and busbars on a switchboard, panelboard, or control board shall be so located as to be free from physical damage. Service sections of such boards shall be separated from the other electrical components. These components shall be properly secured in an approved manner. 

Note, conductors entering a certain section shall terminate in such section, except where it is not practical for control, interconnecting conductors, or other conditions of use.

OVERHEATING AND INDUCTIVE HEATING
408.3(B)

The arrangement of busbars and conductors shall be such as to avoid overheating due to inductive effects. The inductive effect of each conductor is neutralized when grouping all conductors together. To accomplish the minimizing of heating effects, the ungrounded (phase) conductors, grounded (neutral) conductors, and equipment grounding conductors, where used, shall be in the same enclosure, raceway, cable, cord, etc. (See Figure 7-1)

显示全部 ↓
推荐视频

    用户评论

    暂时无评论

    猜您喜欢

    推荐帖子

    求教三极管饱和的原理
    帖子发到别的板块去了,请见谅!http://topic.eeworld.net/u/20090122/23/cfc099f2-873a-4fd8-97d2-35cbe63ea93b.html
    lxchina 嵌入式系统
    buck电路
    大家谁手头有buck电路实物,并能采集输出电压,电容电流,电感电流的实物,谢谢
    powered 电源技术
    请问:IAR怎么把HEAP放到.bss,.data之后??
    IAR怎么把HEAP放到.bss,.data之后??发现IAR默认情况下,总是把HEAP放在了.bss,.data的前面,有没有办法把HEAP放到.bss,.data之后??Image0082.JPG(28.04 KB)下载次数:12009-12-4 11:30
    weiyingwu stm32/stm8
    nios 11.0版本求证问题
    我从一个11.0版本的工程复制了一个工程,然后在下载程序,quartus可以下载,但nios下载,提示 System timestamp mismatch - connected: "0", expected:",sytemid应该是没问题的,我又重新复制了一个工程,依然这样的问题,弄了好久,决定把nios重新建工程,但quartus用原先的工程,再没有出现这个问题想知道复制的工程,nios要重新
    tianma123 FPGA/CPLD
    IDE端口号类似0x170
    我的主板有个Sata接口和IDE接口,原来硬盘接在sata接口,后面我在IDE接口接了个小硬盘,我通过0x170 0x1f0端口通讯 可以读到sata硬盘的信息,可是读不到IDE接口硬盘的信息。难道这时IDE接口的端口号不是 00x170或0x1f0,那是什么呢,怎样才能知道这个IDE 接口的端口号。熟悉硬件的高手指点了。
    zhping08 嵌入式系统
    09元器件清单
    [i=s] 本帖最后由 paulhyde 于 2014-9-15 09:47 编辑 [/i]根据09元器件清单,怎么推断11的元器件清单,根据元器件清单怎么推测题目?[[i] 本帖最后由 open82977352 于 2011-8-26 22:06 编辑 [/i]]
    1057978105 电子竞赛

    推荐内容

    可能感兴趣器件

    EEWorld订阅号

    EEWorld服务号

    汽车开发圈

    About Us 关于我们 客户服务 联系方式 器件索引 网站地图 最新更新 手机版 版权声明

    站点相关: 汽车电子 智能硬件

    北京市海淀区中关村大街18号B座15层1530室 电话:(010)82350740 邮编:100190

    电子工程世界版权所有 京B2-20211791 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号 Copyright © 2005-2023 EEWORLD.com.cn, Inc. All rights reserved