• 本课程为精品课,您可以登录eeworld继续观看:
  • APPLYING 50 PERCENT LOAD DIVERSITY FACTOR - TABLE B.310.14(B)(2)(11)
  • 登录
课程介绍
相关标签: 电子系统
Switchboards are designed with busbars for fuses or circuit breakers that are used for protecting and supplying feeders and branch circuits. Panelboards are designed with a permanently installed main circuit breaker or single set of fuses for disconnecting the number of circuit breakers or fuseholders installed to protect and supply feeders or branch circuits.

SUPPORT AND ARRANGEMENT OF BUSBARS AND CONDUCTORS
408.3

Busbars shall be held firmly in place in the enclosure and shall be arranged in such a way to allow adequate space for conductors to be terminated. Busbars shall be sized with enough capacity to handle the normal currents in amps of the electrical system. In addition, they shall carry safely any type of short-circuit or ground-fault condition.

CONDUCTORS AND BUSBARS ON A SWITCHBOARD OR PANELBOARD
408.3(A)

Conductors and busbars on a switchboard, panelboard, or control board shall be so located as to be free from physical damage. Service sections of such boards shall be separated from the other electrical components. These components shall be properly secured in an approved manner. 

Note, conductors entering a certain section shall terminate in such section, except where it is not practical for control, interconnecting conductors, or other conditions of use.

OVERHEATING AND INDUCTIVE HEATING
408.3(B)

The arrangement of busbars and conductors shall be such as to avoid overheating due to inductive effects. The inductive effect of each conductor is neutralized when grouping all conductors together. To accomplish the minimizing of heating effects, the ungrounded (phase) conductors, grounded (neutral) conductors, and equipment grounding conductors, where used, shall be in the same enclosure, raceway, cable, cord, etc. (See Figure 7-1)

显示全部 ↓
推荐视频

    猜您喜欢

    推荐帖子

    有奖直播:预约“应对 5G 信号生成过程中的测试挑战”,赢Keysight好礼
    直播主题:应对 5G 信号生成过程中的测试挑战直播时间:2019年10月30日,星期三,15:00-17:00直播内容:本期Keysight直播深入探讨了5G关键的测试和技巧,以确保使用毫米波信号发生器进行精确的接收机测量。内容包含:5G 3GPP测试要求测试设置示例如何尽量压缩测试时间预约直播1、点此进入keysight官方直播预约总页面2、如下图所示,先登录,再从左侧表中勾选应对 5G 信号生
    EEWORLD社区 无线连接
    基于MSP430f149单片机的简单秒表
    实现功能:按下一个按键,计时开始,再次按下该按键计时暂停,即由一个按键实现暂停看开始功能,设置另一个按键,按下该按键三秒以上,秒表清零。要求计时精度,10毫秒。该实验用到了MSP430单片机的timerA的定时功能,显示设备而用到了LCD1602.代码如下:#include msp430x14x.h#include Config.hint second = 0, minute = 0, count
    火辣西米秀 微控制器 MCU
    晶振注意事项
    1)电压2)频率3)稳定度4)温漂5)输出类型6)尺寸
    jeanwu 嵌入式系统
    一种应用于NVR/DVR系统的备电方案
    [align=left][color=rgb(85, 85, 85)][font=&quot][size=14px]图一是简单的安防系统框图,主要分为前端产品和后端产品。其中后端产品NVR (Network Video Record) 和前端IP camera对接,一般情况下一个NVR可对接4个,8个,16个IPC。在某些特定情况下,NVR系统需要短时掉电备份以保证数据非丢失。因此NVR的电池的备
    alan000345 TI技术论坛
    0
    攒分赚人品[color=#FFFFFF]谢谢清洁工和大兔子[/color]
    sure549 嵌入式系统
    请问,终端或者协调器使用多次串口打印后容易挂掉,这是怎么回事?
    我用的是cc2530,目前在用协议栈的sample例程做广播和点播的实验,先是协调器周期性发送(有用软件里定时触发事件,也有用串口定时发送指令触发事件),终端接收后执行HalUARTWrite(0, "Success 3!", 10);,发现打印次数多了之后要么协调器挂了要么终端就挂了。我对终端掉线有做软重启的处理,可以看到如果协调器不挂的话,终端是不会执行到这一步的。所以现在我有两个问题:1)为
    喵星人の马甲 无线连接

    推荐内容

    热门视频更多

    可能感兴趣器件

    完成课时学习+分/次

     
    EEWorld订阅号

     
    EEWorld服务号

     
    汽车开发圈

     
    机器人开发圈

    About Us 关于我们 客户服务 联系方式 器件索引 网站地图 最新更新 手机版 版权声明

    站点相关: 汽车电子 智能硬件

    北京市海淀区中关村大街18号B座15层1530室 电话:(010)82350740 邮编:100190

    电子工程世界版权所有 京B2-20211791 京ICP备10001474号-1 电信业务审批[2006]字第258号函 京公网安备 11010802033920号 Copyright © 2005-2025 EEWORLD.com.cn, Inc. All rights reserved